Not sure about subscribing? Every plan starts with a free 2-day trial—try it out, and cancel anytime before billing.
Learn more
Answered on: N/A. Time taken: N/A.
Retry question

Prior Auth

Case Interview Practice > 
Exhibit Analysis

The Bain team pulled MedBridge's current prior authorization data alongside the new regulatory benchmarks. The COO suspects the turnaround time gap is manageable but is less sure about the digital infrastructure requirement. Take a look at Exhibit 1 and tell me what you see.

Case Exhibit

Your Response
Whoops... look like you haven't answered this question yet.
Sample answer from an expert consultant

The exhibit surfaces two distinct compliance challenges that require different solutions and different timelines.

On turnaround time, MedBridge is closer to compliant than the COO may have feared. Current average turnaround for standard requests is 6 days against a new requirement of 7 days, meaning standard requests are already within the threshold. Urgent requests are the problem: MedBridge is averaging 48 hours against a new 24-hour requirement. This is a process and staffing problem, not a technology problem, and is likely addressable through dedicated urgent review routing and extended review hours without a major system overhaul.

On digital infrastructure, the gap is more serious. Only 22% of MedBridge's authorization requests currently come through a digital channel. The regulation requires full digital interoperability with provider EHR systems within 18 months. Getting from 22% to full digital submission capability is a significant technology implementation challenge, and 18 months is a tight timeline for an organization that has likely relied on fax and phone-based processes for most of its history.

The strategic implication is that MedBridge should treat these as two separate workstreams with different urgency. The turnaround time fix can likely be achieved within 6 months through process changes alone. The digital infrastructure build is the critical path item that needs to start immediately and will consume the majority of the compliance budget and management attention.

34-2